before information system is developed, usually beforehand begun with existence a insident and that system development planning. without good system design existence, system development will not such as those which supposed. system design is guide to do system development.
system wisdom
wisdom to develop information system is done by management top, because management wishes for to reaches chances existing unachievable by old ones system or has many weaknesses necessary at improve. for example, some years ago management from mckenson decide wisdom to apply a system design to develop inwrought information system to increase productivity from employees.
system design
after top management decides wisdom to develop information system, before that system is at develops, so necessary planned beforehand. system design concerns estimation from physical needs, worker, and cost that wanted to support from system development. system design usually handled by staff system designer, if staff this is there is no, so planning can be done by system department.
- planning staff has task to do system design based on system wisdom that appointed by management top. when staff this there is no, so the function will be taken to displace by department system developers.
- has task to develop system as according to plan that made ole planning staff and when does this there is no, the function will be taken to displace by system developers consultant outside company.
- has task to operate system that developed by system developers department
system design process
system design process can be grouped to into three principal process, that is:
- plan system projects that done by system designer staff.
- will determine system projects that be developed that done by director committee.
- define system projects that developed by systems analysis.
stages plan system project:
1. determine aim, planning with tactics companies.
2. identify system projects
3. decide system projects target
4. decide system projects obstacle
5. menetu system projects priority.
6. make system design report.
will prepare system projects that be developed
1. indicate team analysis
2. announce system developers project
define system projects that developed
thereby task that must be done by team analysis in this stage:
1. identify to return scope and system project target,
2. do feasibility study,
3. evaluate system project feasibility,
4. make project proposal,
5. ask management sanctions.
do feasibility study
feasibility study a study that be used to menetu is system development proper at go on
or at stop. this watchfulness aims unuk:
1. realize operation from old ones system
2. determine system user needs marginally to can achieve these system target.
3. determine troubleshoots that so that old ones system not yet can achieve aim.
evaluate system project feasibility
five feasibility that can considering:
1. technique feasibility
2. operation feasibility
3. schedule feasibility
4. economy feasibility
5. law feasibility